The Dream Train

The Shinkansen and Japanese Rail Culture

Course 4 · Chapter 4 · The Dream Train

The idea of a very fast, dedicated line between Tokyo and Osaka did not begin in the 1960s. Plans for a standard-gauge high-speed route were discussed before the Second World War (check the details), and some construction work was started and then abandoned. After the war the old Tokaido line was overloaded, and the idea returned. This chapter follows how a dream became a project, who made it happen, and how it opened just ahead of the 1964 Tokyo Olympics (check the date).

Why a New Line Was Needed

An overloaded corridor

The Tokaido corridor linked the biggest cities and carried a huge share of passengers and freight on a narrow-gauge line already near capacity (check the figures).

The gauge problem

As Chapter 2 explained, the narrow gauge limited speed and capacity. A new standard-gauge line could be built to a higher specification.

National confidence

After the war, a flagship project offered a way to show Japan's recovery and technical skill to its own people and to the world.

The People

Large projects are never the work of one person, though a few names are associated with this one. The head of the national railways at the time, Shinji Sogo, is often credited with pushing the project through, and the engineer Hideo Shima is often named as chief engineer (check both names, roles and spellings). Many designers who had worked on aircraft before and during the war moved into railway research, bringing knowledge of aerodynamics and vibration (check this claim).

Beware the lone hero Popular accounts tend to give a project like this to one visionary. In reality it depended on political backing, a loan from abroad (check the source), engineers, surveyors, construction crews and suppliers. Treat the single-inventor version as legend, in the sense of Chapter 1.

Cost and Controversy

The budget grew well beyond the original estimate, and the president of the national railways reportedly resigned in connection with the overrun (check this carefully). The line was still opened on schedule, and the commercial success that followed largely settled the argument.

A British comparison Britain's own high-speed plans have been argued over for decades, from the Advanced Passenger Train of the 1970s and 80s to HS2 (check the current status). The Japanese project is a useful contrast: one corridor, one clear need, a fixed deadline and strong central backing. Whether that can be repeated elsewhere is a fair question for the capstone chapter.

The 1964 Opening

FeatureAt opening (check all figures)
RouteTokyo to Osaka along the Tokaido corridor
Top speedAround 200 km/h in service, with a trip time of about four hours at first
TrackStandard gauge, on dedicated track with no level crossings
TimingOpened shortly before the Tokyo Olympics
Why dedicated track mattered Running fast trains on their own track, without crossings or slow trains in the way, was as important as the trains themselves. Most of the reliability and speed the Shinkansen became known for comes from the system, not just the vehicles.

Exercises

Exercise 1

List three reasons a new line was needed along the Tokaido corridor, and link at least one to Chapter 2.

Exercise 2

In three sentences, explain why giving the Shinkansen to a single visionary is misleading, and name who else was involved.

Exercise 3

Compare the travel time between Edinburgh and London today with the original Tokyo to Osaka time (check both). Write two sentences on what the comparison does and does not show.

Quick Reference

  • Need: overloaded corridor, gauge limits, national confidence
  • People: a railway chief, a chief engineer and many others (check names)
  • Opening: 1964, Tokyo to Osaka, standard gauge on dedicated track
  • Cost: well over the first estimate (check)
  • Lesson: the system, not only the train, delivered the speed
  • Check: pre-war plans, names and roles, budget and resignation story, speeds and times at opening, British high-speed status

Next chapter: Inside the Bullet Train, which covers the track, signalling, earthquake detection and the famous punctuality.